SMPTE-311M · HYBRID CAMERA CABLE

Hybrid camera cable, terminated with LEMO connectors

Digilight builds finished SMPTE-311M hybrid cable assemblies — two fibers, two power and two signal conductors — for OB vans, field production and live broadcast. You choose the length, jacket and marking; we terminate, test and document every assembly.

Standard
SMPTE-311M
Conductors
2F + 2P + 2S
Connector
LEMO 3K.93C.Y W-key
Termination
Factory, both ends

Finished assemblies made to order, not fixed stock lengths.

What we deliver

Cable and connector are supplied as one tested assembly, so the production team installs it and goes on air.

SMPTE-311M hybrid cable

Two single-mode fibers, two power conductors and two signal conductors in one jacket, rated for camera power and control.

LEMO 3K.93C.Y termination

Connectors assembled, polished and inspected in-house. SMPTE 304M mating interface for camera and CCU connections.

Test before shipment

Interferometer inspection, insertion loss, return loss, hipot and continuity checks on every finished assembly.

Traceable documentation

Serial-numbered test record, LEMO batch COC and compliance documents supplied with the shipment.

Assembly specification

Typical values for a terminated hybrid camera cable. Final parameters are confirmed on the order drawing.

Each shipment includes traceable batch documents. Connector COC is lot-based; optical interferometer testing is performed after termination.

CPR Eca DoPNB fire test reportLEMO batch COCINMETRO partner CNPJ
Standard
SMPTE-311M hybrid camera cable
Configuration
2 fibers + 2 power + 2 signal conductors
Connector
LEMO 3K.93C.Y W-key, SMPTE 304M mating
Length
5 m to 300 m, made to order
Jacket
PUR, black, 10.0 mm nominal
Termination
Both ends terminated and strain relieved
Testing
Interferometer, IL/RL, hipot, continuity
Documentation
Test report per serial number, LEMO batch COC

From requirement to delivery

Four steps, one point of contact for cable, connector and documentation.

01

Share the requirement

Length, deployment type, connector mix and any drawing you already have.

02

Confirm the configuration

We return a specification with cable, connector, jacket, marking and test scope.

03

Assembly and test

Termination, polishing and measurement on the bench, recorded against the serial number.

04

Delivery documents

Packing with test records, COC documents and meter marking ready for installation.

Send your specification

Tell us the length, connector configuration and quantity. We reply with a quotation and technical datasheet.