SMPTE-311M · HYBRID CAMERA CABLE
Hybrid camera cable, terminated with LEMO connectors
Digilight builds finished SMPTE-311M hybrid cable assemblies — two fibers, two power and two signal conductors — for OB vans, field production and live broadcast. You choose the length, jacket and marking; we terminate, test and document every assembly.
- Standard
- SMPTE-311M
- Conductors
- 2F + 2P + 2S
- Connector
- LEMO 3K.93C.Y W-key
- Termination
- Factory, both ends
Finished assemblies made to order, not fixed stock lengths.
What we deliver
Cable and connector are supplied as one tested assembly, so the production team installs it and goes on air.
SMPTE-311M hybrid cable
Two single-mode fibers, two power conductors and two signal conductors in one jacket, rated for camera power and control.
LEMO 3K.93C.Y termination
Connectors assembled, polished and inspected in-house. SMPTE 304M mating interface for camera and CCU connections.
Test before shipment
Interferometer inspection, insertion loss, return loss, hipot and continuity checks on every finished assembly.
Traceable documentation
Serial-numbered test record, LEMO batch COC and compliance documents supplied with the shipment.
Assembly specification
Typical values for a terminated hybrid camera cable. Final parameters are confirmed on the order drawing.
Each shipment includes traceable batch documents. Connector COC is lot-based; optical interferometer testing is performed after termination.
- Standard
- SMPTE-311M hybrid camera cable
- Configuration
- 2 fibers + 2 power + 2 signal conductors
- Connector
- LEMO 3K.93C.Y W-key, SMPTE 304M mating
- Length
- 5 m to 300 m, made to order
- Jacket
- PUR, black, 10.0 mm nominal
- Termination
- Both ends terminated and strain relieved
- Testing
- Interferometer, IL/RL, hipot, continuity
- Documentation
- Test report per serial number, LEMO batch COC
From requirement to delivery
Four steps, one point of contact for cable, connector and documentation.
Share the requirement
Length, deployment type, connector mix and any drawing you already have.
Confirm the configuration
We return a specification with cable, connector, jacket, marking and test scope.
Assembly and test
Termination, polishing and measurement on the bench, recorded against the serial number.
Delivery documents
Packing with test records, COC documents and meter marking ready for installation.
Send your specification
Tell us the length, connector configuration and quantity. We reply with a quotation and technical datasheet.